Pages

Tuesday, December 23, 2025

TRAIN TIME: 2025 Christmas Train Layout - New Schreiber Cardboard House - Shutters Open

The most finnicky part of this build was cutting open the shutters for each window (20 each), then cutting out each of the window inserts and gluing them in pace. The second challenge was gluing the side walls to the ends such that you formed the overhanging portion of the side walls correctly. I'm really glad though that I went through with the build which took about 6.5 hours total over two days.

Ed.






No comments:

Post a Comment